Transfer Solar Park 

Waterville, Maine

GIZOS is developing a 20MWp solar array at the City of Waterville’s closed and capped landfill. The project is the result of significant effort on the part of GIZOS and the City of Waterville.



Project Details

Target Output: 20 megawatts

Interconnection Voltage: 34.5kV

Total Acreage: 133



Broadhead Solar Park 

Waterville, Maine


GIZOS is developing a 4.99MWp solar array on municipally-owned land.



Project Details

Target Output: 4.99 megawatts

Total Acreage: 27


Bikepath Solar Park 

Warwick, RI


GIZOS is developing a 249kW solar array on private land.



Project Details

Target Output: 249 kilowatts

PPA rate: 22.75 cents

Interconnection agreement complete

Target COD - Q1 2018

Barefoot Solar Park 

Fairfield, Maine


GIZOS is developing a 5mw solar array at the Town of Fairfield's closed and capped landfill




Project Details

Target Output: 4.99 megawatts

Total Acreage: 22